Skip to content
Bismarck

Bismarck Building Permits and Permit Search

Our Bismarck feed carried 398 permit records across 19 record types in the last 30 days. The busiest was MECHANICAL (94). The newest 12 filings are in the table below. ZoneWire's Bismarck feed holds 4,925 permit records to date.

Bismarck permits with the owner of record and contractor as listed, with CSV export, search and saved searches. Pro, $39 a month for Bismarck, 7-day trial.

Recent Bismarck permit filings

Permit records obtained from official sources. One record is shown in full below; the rest carry the filing facts.

BSGN2026-0146SIGN BUILDING WALLISSUED

4205 STATE ST

(2) 4' x 8' non-illuminated wall sign (west, south)

Filed October 14, 2026
RecordTypeAddressStatusFiled
BSGN2026-0146SIGN BUILDING WALL4205 STATE STISSUEDOctober 14, 2026
BSGN2026-0145SIGN MONUMENT4205 STATE STISSUEDOctober 14, 2026
BSGN2026-0088SIGN BUILDING WALL2625 STATE STISSUEDOctober 14, 2026
BRES2026-0548RESIDENTIAL ALTERATION1724 N 5TH STISSUEDOctober 14, 2026
BMEC2026-1235MECHANICAL2625 STATE STISSUEDOctober 14, 2026
BMEC2026-1228MECHANICAL4125 KITES LNISSUEDOctober 14, 2026
BELC2026-0860ELECTRICAL2507 ASTRONAUT DRISSUEDOctober 14, 2026
BELC2026-0859ELECTRICAL3500 MIRIAM AVEISSUEDOctober 14, 2026
BELC2026-0858ELECTRICAL5210 HOLMES DRISSUEDOctober 14, 2026
FRFA2026-0042ELECTRICAL216 N 23RD STISSUEDOctober 13, 2026
EXC2026-0366SITE WORK2108 DAKOTA DRISSUEDOctober 13, 2026
EXC2026-0356SITE WORK1704 N 5TH STISSUEDOctober 13, 2026

What a permit record does not carry

A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. ZoneWire has read 125 Bismarck council and commission meetings from the last 24 months and holds 273 land-use decisions from them, each with the board that heard it, and the vote where one was recorded.

Browse the Bismarck hearing record

Bismarck building permit questions

The newest Bismarck building permit filings are in our Bismarck feed, each with its record number, its record type and the date it was filed. Permit records obtained from official sources.

Our Bismarck feed carried 398 permit records across 19 record types in the last 30 days. The busiest was MECHANICAL (94).

No. A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. That hearing is a separate public record, held by the board that heard it.

Who is doing the work on Bismarck filings.

Bismarck permits with the owner of record and contractor as listed, with CSV export, search and saved searches. Pro, $39 a month for Bismarck, 7-day trial.

Get told when your street is on an agenda.

Free email alerts when a land-use item in Bismarck is scheduled for a public hearing. No card, and you can stop them in one click.

Permit records obtained from official sources.