Skip to content
Boulder County

Boulder County Building Permits and Permit Search

Our Boulder County feed carried 627 permit records across 19 record types in the last 30 days. The busiest was MECHANICAL (232). The newest 12 filings are in the table below. ZoneWire's Boulder County feed holds 7,290 permit records to date.

Boulder County permits, with CSV export, search and saved searches. Pro, $39 a month for Boulder County, 7-day trial.

Recent Boulder County permit filings

Permit records obtained from official sources. One record is shown in full below; the rest carry the filing facts.

WCF2025-00060WIRELESS FACILITY PERMITIssued

3003 14TH ST

Small Cell Facility Due to system limitations, wireless facility permits have two permits that require review, approval and inspection together. Permits ELE2025-01324 and WCF2025-00060. Small Cell - TI5276 WCF Standalone Pole (INT 14TH & ELDER): Proposed standalone small cell with antennas and associated equipment in right of way W of the intersection of 14th St and Elder Ave.

Filed October 16, 2026
RecordTypeAddressStatusFiled
WCF2025-00060WIRELESS FACILITY PERMIT3003 14TH STIssuedOctober 16, 2026
WCF2025-00059WIRELESS FACILITY PERMIT2544 KENWOOD DRIssuedOctober 16, 2026
ELE2025-01324ELECTRICAL3003 14TH STIssuedOctober 16, 2026
ELE2025-01323ELECTRICAL2544 KENWOOD DRIssuedOctober 16, 2026
WCF2026-00011WIRELESS FACILITY PERMIT1020 LARAMIE BLVDIssuedOctober 16, 2026
ELE2026-00401ELECTRICAL1020 LARAMIE BLVDIssuedOctober 16, 2026
BLD-SFD2026-00425RESIDENTIAL ALTERATION2851 20TH STIssuedOctober 16, 2026
BLD-MFD2026-00085MULTIFAMILY ALTERATION60 SOUTH BOULDER CIR 6031IssuedOctober 16, 2026
BLD-SFD2026-00461RESIDENTIAL ALTERATION1905 ARAPAHOE AVEIssuedOctober 16, 2026
BLD-SFD2026-00458RESIDENTIAL ALTERATION1010 9TH STIssuedOctober 16, 2026
ELE2026-00907ELECTRICAL1850 FOLSOM STIssuedOctober 16, 2026
BLD-MXU2026-00018COMMERCIAL ALTERATION1102 PEARL STIssuedOctober 16, 2026

What a permit record does not carry

A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. ZoneWire has read 72 Boulder County council and commission meetings from the last 24 months and holds 74 land-use decisions from them, each with the board that heard it, and the vote where one was recorded.

Browse the Boulder County hearing record

Boulder County building permit questions

The newest Boulder County building permit filings are in our Boulder County feed, each with its record number, its record type and the date it was filed. Permit records obtained from official sources.

Our Boulder County feed carried 627 permit records across 19 record types in the last 30 days. The busiest was MECHANICAL (232).

No. A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. That hearing is a separate public record, held by the board that heard it.

Boulder County filings, searchable and exportable.

Boulder County permits, with CSV export, search and saved searches. Pro, $39 a month for Boulder County, 7-day trial.

Get told when your street is on an agenda.

Free email alerts when a land-use item in Boulder County is scheduled for a public hearing. No card, and you can stop them in one click.

Permit records obtained from official sources.