Data center · Bismarck, ND
Data center specific use standard Section 5-310 land use code amendment
Basin Electric / NextEra EnergyHighway 31, two miles south of Highway 200, between Hayes and Center, Mercer CountyApproved
Where this stands
Approved as of the July 9, 2026 hearing in Bismarck, ND; 6 hearings tracked.
Case factsSource: ZoneWire
- Developer
- Basin Electric / NextEra Energy
- Location
- Highway 31, two miles south of Highway 200, between Hayes and Center, Mercer County
- Status
- Approved
- Hearings tracked
- 6
- First seen
- Feb 12, 2026
- Latest hearing
- Aug 26, 2026
The hearing chain
how this case has moved through county hearings- First seen Feb 12, 2026
- Latest hearing Aug 26, 2026
6 hearings tracked across this span.
Is there a data center moratorium here?
A data center moratorium was discussed at a county hearing.
Hearing timeline
every tracked hearing with outcome and detail6 hearings on the record
Full detail for all 6 hearings: date, outcome, vote, and the summary of each.
Unlock with ZoneWire ProConditions of approval
verbatim, as recorded1 condition of approval
All 1 condition of approval, verbatim.
Unlock with ZoneWire ProAnalysis
What this means
A structured read of what the record adds up to: entitlement status, the moratorium's effect, the permit-lag signal, and the utility friction behind it.
Unlock with ZoneWire ProCovered by your Pro credits (3 included monthly), otherwise $19.