Skip to content
Mesa

Mesa Building Permits and Permit Search

Our Mesa feed carried 353 permit records across 13 record types in the last 30 days. The busiest was RESIDENTIAL ELECTRICAL (68). The newest 12 filings are in the table below. ZoneWire's Mesa feed holds 5,243 permit records to date.

Mesa permits with the contractor, license and phone as listed, searchable, with saved searches and CSV export. Pro, $39 a month for Mesa, 7-day trial.

Recent Mesa permit filings

Permit records obtained from official sources. One record is shown in full below; the rest carry the filing facts.

PMT26-18745RESIDENTIAL ALTERATIONIssued

Tausig-Desert Uplands-Temp Fence

8265 E KRAMER CIR

This permit is for installation of the temporary protective fence only. No grading, plant removal, or construction shall begin until a separate construction permit is issued. Temporary protective fence is required to remain in place at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times.

Filed October 15, 2026
RecordTypeAddressStatusFiled
PMT26-18745RESIDENTIAL ALTERATION8265 E KRAMER CIRIssuedOctober 15, 2026
PMT26-18633RESIDENTIAL ELECTRICAL1515 N AARONIssuedOctober 15, 2026
PMT26-18619RESIDENTIAL ELECTRICAL1625 E GREENWAY STIssuedOctober 15, 2026
PMT26-18613RESIDENTIAL PLUMBING3120 E RUSSELL STIssuedOctober 15, 2026
PMT26-18547RESIDENTIAL SITE WORK7339 E PLATA AVEIssuedOctober 15, 2026
PMT26-18522RESIDENTIAL PLUMBING2365 E CAMINO STIssuedOctober 15, 2026
PMT26-18442RESIDENTIAL ELECTRICAL1303 W PECOS AVEIssuedOctober 15, 2026
PMT26-18329RESIDENTIAL PLUMBING7516 E HANNIBAL STIssuedOctober 15, 2026
PMT26-18153RESIDENTIAL NEW CONSTRUCTION10543 E UTOPIA AVEIssuedOctober 15, 2026
PMT26-17552RESIDENTIAL PLUMBING1021 N AMBER CIRIssuedOctober 15, 2026
PMT26-17543RESIDENTIAL ELECTRICAL10201 E TILLMAN AVEIssuedOctober 15, 2026
PMT26-17441RESIDENTIAL ALTERATION748 W NIDO CIRIssuedOctober 15, 2026

What a permit record does not carry

A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. ZoneWire has read 50 Mesa council and commission meetings from the last 24 months and holds 62 land-use decisions from them, each with the board that heard it, and the vote where one was recorded.

Browse the Mesa hearing record

Mesa building permit questions

The newest Mesa building permit filings are in our Mesa feed, each with its record number, its record type and the date it was filed. Permit records obtained from official sources.

Our Mesa feed carried 353 permit records across 13 record types in the last 30 days. The busiest was RESIDENTIAL ELECTRICAL (68).

No. A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. That hearing is a separate public record, held by the board that heard it.

Who is doing the work on Mesa filings.

Mesa permits with the contractor, license and phone as listed, searchable, with saved searches and CSV export. Pro, $39 a month for Mesa, 7-day trial.

Get told when your street is on an agenda.

Free email alerts when a land-use item in Mesa is scheduled for a public hearing. No card, and you can stop them in one click.

Permit records obtained from official sources.