Skip to content
Phoenix

Phoenix Building Permits and Permit Search

Our Phoenix feed carried 75 permit records across 12 record types in the last 30 days. The busiest was BLD (35). The newest 12 filings are in the table below, updated daily. The newest filing on record here is September 2, 2026. ZoneWire's Phoenix feed holds 400 permit records to date.

Recent Phoenix permit filings

Scraped from the City of Phoenix's own record system. One record is shown in full below; the rest carry the filing facts.

26010192SOPEN

5088 W INNOVATION CIR

Structural, Industrial/Warehouses

Filed September 2, 2026
RecordTypeAddressStatusFiled
26010192S5088 W INNOVATION CIROPENSeptember 2, 2026
26010176MECH32400 N 51ST AVEOPENSeptember 1, 2026
26010169ME5088 W INNOVATION CIROPENAugust 31, 2026
26010147S32200 N 43RD AVEOPENAugust 31, 2026
26010109BLD4810 S CENTRAL AVEOPENAugust 27, 2026
26010104BLD4909 E BEVERLY RDOPENAugust 27, 2026
26010098BLD2926 E MCDOWELL RDOPENAugust 27, 2026
26010091BLD5309 E VAN BUREN STOPENAugust 26, 2026
26010090BLD5309 E VAN BUREN STOPENAugust 26, 2026
26010040S5088 W INNOVATION CIROPENAugust 25, 2026
26010039BLDS2045 W HILTON AVEOPENAugust 25, 2026
26010038ELEC5088 W INNOVATION CIROPENAugust 25, 2026

What a permit record does not carry

A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. ZoneWire has read 32 Phoenix council and commission meetings from the last 24 months and holds 51 land-use decisions from them, each with the board that heard it, and the vote where one was recorded.

Browse the Phoenix hearing record

Phoenix building permit questions

Building permits in Phoenix are issued by the City of Phoenix and published in SHAPE PHX Portal at https://shapephx.phoenix.gov/s/, which is free to search and is the authoritative record. The newest of those filings are in our Phoenix feed, each with its record number, its record type and the date it was filed.

The City of Phoenix issues building permits in Phoenix and publishes them in SHAPE PHX Portal at https://shapephx.phoenix.gov/s/.

Our Phoenix feed carried 75 permit records across 12 record types in the last 30 days. The busiest was BLD (35). The newest filing on record here is September 2, 2026.

No. A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. That hearing is a separate public record, held by the board that heard it.

The permit tells you someone is building. The hearing tells you what they agreed to.

A ZoneWire subscription opens the decision behind the filing: how each board member voted, the conditions the board attached where it set any, and the owner of record on the parcels we have matched.

Get told when your street is on an agenda.

Free email alerts when a land-use item in Phoenix is scheduled for a public hearing. No card, and you can stop them in one click.