Skip to content
Sacramento

Sacramento Building Permits and Permit Search

Our Sacramento feed carried 601 permit records across 30 record types in the last 30 days. The busiest was RESIDENTIAL ELECTRICAL (155). The newest 12 filings are in the table below. ZoneWire's Sacramento feed holds 19,927 permit records to date.

Sacramento permits, with CSV export, search and saved searches. Pro, $39 a month for Sacramento, 7-day trial.

Recent Sacramento permit filings

Permit records obtained from official sources. One record is shown in full below; the rest carry the filing facts.

RES-2621491RESIDENTIAL ROOFINGIssued

985 PIEDMONT DR

E-Permit: Tear Off - Yes, Resheet - Yes, 1 layer(s), 40 squares of Composite Class A. CRRC: 0676-0142

Filed September 27, 2026
RecordTypeAddressStatusFiled
RES-2621491RESIDENTIAL ROOFING985 PIEDMONT DRIssuedSeptember 27, 2026
RES-2621490RESIDENTIAL ROOFING3971 E PACIFIC AVEIssuedSeptember 27, 2026
RES-2621489RESIDENTIAL ELECTRICAL2415 ENCINAL AVEIssuedSeptember 27, 2026
RES-2621403RESIDENTIAL PLUMBING7486 SALTON SEA WAYIssuedSeptember 25, 2026
RES-2621397RESIDENTIAL ALTERATION424 SAN ANTONIO WAYIssuedSeptember 25, 2026
RES-2621396RESIDENTIAL MECHANICAL7181 HAVENSIDE DRIssuedSeptember 25, 2026
RES-2621031RESIDENTIAL ELECTRICAL2065 SILVER CTIssuedSeptember 25, 2026
COM-2617368COMMERCIAL ALTERATION180 PROMENADE CIR 100IssuedSeptember 25, 2026
RES-2621394RESIDENTIAL ROOFING14 DOWNRIVER CTIssuedSeptember 25, 2026
RES-2621392RESIDENTIAL ELECTRICAL50 NUTWOOD CIRIssuedSeptember 25, 2026
RES-2621391RESIDENTIAL ROOFING6247 BROADWAYIssuedSeptember 25, 2026
RES-2621390RESIDENTIAL ROOFING47 GREENWAY CIRIssuedSeptember 25, 2026

What a permit record does not carry

A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. ZoneWire has read 55 Sacramento council and commission meetings from the last 24 months and holds 20 land-use decisions from them, each with the board that heard it, and the vote where one was recorded.

Browse the Sacramento hearing record

Sacramento building permit questions

The newest Sacramento building permit filings are in our Sacramento feed, each with its record number, its record type and the date it was filed. Permit records obtained from official sources.

Our Sacramento feed carried 601 permit records across 30 record types in the last 30 days. The busiest was RESIDENTIAL ELECTRICAL (155).

No. A permit record is the construction paperwork: a number, a type, a status and a date. The land-use decision that made the project legal happened earlier, in a public hearing, and it is not in the permit portal. That hearing is a separate public record, held by the board that heard it.

Sacramento filings, searchable and exportable.

Sacramento permits, with CSV export, search and saved searches. Pro, $39 a month for Sacramento, 7-day trial.

Get told when your street is on an agenda.

Free email alerts when a land-use item in Sacramento is scheduled for a public hearing. No card, and you can stop them in one click.

Permit records obtained from official sources.